Infrastructure Capital Improvement Plan (ICIP) 2009-2013 INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN (ICIP) 2012-2016
Entity Code_________
Entity: Village of Taos Ski Valley Type:  MU
Priority Project Title Category Funding  2012 2013 2014 2015[1] 2016 Total
1 2012-1 Design & Construct Kachina Village Water System Improvements Per Water Master Plan Water SGRANT FGRANT LOCAL OTHER  $1,500,000
2 2012-2 Installation of Kachina Lift Station Wastewater/Water  LOCAL OTHER $250,000
3 2012-3 Purchase Bobcat with snow blower Roads/Streets/Bridges LOCAL OTHER $32,000
4 2012-4 Three Phase Electrical Connection to Homes General LOCAL OTHER $44,000 $44,000 $44,000 $44,000 $44,000
5 2012-5 Construction of Phase III, Improvements to Twining Road Roads/Streets/Bridges SGRANT FGRANT LOCAL OTHER  $55,000
6 2012-6 Acquire Land from Forest Service including land for Public Safety Building General/ Wastewater/Water LOCAL OTHER $80,000
7 2012-7 Purchase Police Patrol Vehicle  Law Enforcement  SGRANT SLOAN LOCAL OTHER  $36,000
14 2013-1 Construction of Phase III of the Community-Wide Wastewater Collection Line Extension   Wastewater/Water  SGRANT FGRANT LOCAL OTHER  $328,000
8 2013-2 Beaver Pond Sediment Control Project SGRANT/LOCAL /OTHER $100,000
9 2013-3 Purchase Land for Pedestrian Walkways in Village Core  Roads/Streets/Bridges SGRANT FGRANT LOCAL OTHER  $150,000
10 2013-4 Construct Kachina Road Improvements, Phase II Roads/Streets/Bridges $70,000
11 2013-5 Design and Construct Kachina Road Improvements (Hiker Parking to Bavarian) Roads/Streets/Bridges SGRANT FGRANT LOCAL OTHER  $100,000
12 2013-6 Relocate/Construct Fire Substation Fire Equipment  SGRANT SLOAN LOCAL OTHER  $100,000 $100,000
13 2013-7 Acquire Land for Bike/Walking Path (Amizette) Roads/Streets/Bridges SGRANT FGRANT LOCAL OTHER  $100,000
15 2014-1 Construct Kachina Road Improvements, Phase III Roads/Streets/Bridges $70,000
16 2014-2 Design New Wastewater Treatment Plant Wastewater/Water  $50,000
17 2014-3 Re-do Plans for Public Safety Building Law Enforcement/Fire/ General LOCAL OTHER $30,000
18 2015-1 Construct Public Safety Building  Law Enforcement/Fire/ General LOCAL OTHER $1,100,000
19 2015-2 Construct Phase IV of the Community-Wide Wastewater Collection Line Extension (Includes Amizette) Wastewater/Water  SGRANT FGRANT LOCAL OTHER  $1,300,000
20 2015-3 Construct New Wastewater Treatment Plant $5,000,000
Totals: $1,997,000 $992,000 $294,000 $7,444,000 $44,000 $10,771,000
Updated September 30, 2010
Approved